PipeCast Rigid is a 1:1, fast-set, spray applied two-component structural polyurethane coating, highlighted by its high tensile strength and flexural modulus. When properly applied, this unfilled coating should last after the substrate deteriorates. Ideal cure temperature is 75°F for 24 hours.
For further details contact your IPP Solutions Representative.
PipeCast Rigid - A (5 gallon)
- PipeCast Rigid adheres extremely well to prepared concrete.
- PipeCast Rigid should be applied through a two component,
- heated, high pressure proportioning unit (1A:1B) capable of dynamic spray pressures of 2000 psi. Reactor heat should be set at 160°F for A and B sides along with the hose.
- At least 4” - 8” static mix nozzle must be used.
- Material must achieve a uniform temperature between 120°F to 160°F before spraying.
- Material must be agitated or stirred constantly or every ten minutes (depending on if you have added an internal agitator or not to the material cannisters).